How long does a Solana audit take? Timeline from first call to final report

By Kuba Malarczyk, Founder · · Updated

A Solana audit takes about 1-2 weeks of review for a simple or standard program of up to 1,500 lines, 3-5 weeks for a 3,000-line DeFi protocol, and 6-12 weeks for a large multi-program protocol in native Rust. Including booking, the wait for a slot, fixes and the fix review, plan 6-12 weeks from first call to final report.

Solana audit timeline at a glance
ProjectCode in scopeEngineer-daysReview time
Simple (token vesting)500 lines3.51-2 weeks
Standard (staking)1,500 lines7.51-2 weeks
DeFi (lending, 2 programs, oracle)3,000 lines233-5 weeks
Large DeFi (perps DEX, native Rust, 3 programs)6,000 lines56.56-12 weeks

From our audit cost calculator method: Anchor unless noted, fix review included, no rush. Short end: two engineers in parallel; long end: one engineer. Booking and waiting for a start date come on top.

Key takeaways
  • The review itself usually takes one to four weeks; the whole process, from first call to final report, more often takes six to twelve.
  • The longest wait is often the queue: established Solana auditors are commonly booked several weeks ahead.
  • Code size and complexity set the review length; two engineers in parallel roughly halve the calendar time.
  • Plan the fix review into the schedule. A report without re-checked fixes is not the end of the audit.
  • Contact auditors as soon as the scope is stable, not when the code is finished.

"We launch in three weeks, can you audit us?" is one of the most common messages Solana auditors receive, and the honest answer is usually no. Not because the review takes three weeks, but because everything around it does: finding the right firm, waiting for a slot, fixing what they find and having the fixes checked.

The short answer

For a single Anchor program of a few thousand lines, the review itself typically takes one to three weeks with two engineers. Large DeFi protocols with several programs, custom math and integrations can take a month or more. Counting booking, waiting and the fix review, most teams should plan six to twelve weeks from the first call to a published report.

Where the time goes

PhaseTypical timeWhat happens
Finding and booking an auditor1 to 2 weeksShortlist, scoping calls, quotes, contract
Waiting for the start date2 to 8 weeksGood firms are booked ahead, more so before big launches
The review itself1 to 4+ weeksDepends on code size, complexity and team size
Fixing findings3 days to 2 weeksYour team, in parallel with report drafting
Fix review and final report3 to 10 daysAuditors re-check every fix and publish the report

These ranges are typical, not guaranteed. A small program with a firm that has a gap in its calendar can go from first call to report in two weeks; a novel protocol in a busy season can wait two months just to start.

What makes the review longer

How to get audited sooner

Rush audits cost more and often find less. If a firm offers to fully review a complex protocol in a few days, ask how many engineers, for how many days, and what is out of scope. Less time on your code is the most common reason audits miss bugs.

Do not forget the fix review

The first report is a list of findings, not a clean bill of health. Your team fixes them, and the auditors check every fix before the final report. Budget three to ten days for this, include it in the quote, and do not schedule the launch for the day the first report lands. Our audit readiness checklist covers what to prepare, and our guide to reading an audit report explains what to check before you call it done.

A realistic plan for a mainnet launch

Work backwards from the launch date: at least a week of buffer before launch, the fix review before that, your fixes before that, the review itself, and the start date the auditor gave you. If that puts the first call in the past, either move the launch or cut the scope. For the rest of the launch, go through the Solana pre-launch security checklist, and to compare firms, see how to choose a Solana auditor.

Frequently asked questions

How long does a Solana smart contract audit take?

The review of a single Anchor program of a few thousand lines typically takes one to three weeks with two engineers; large DeFi protocols can take a month or more. Including booking, waiting for a slot and the fix review, plan six to twelve weeks from first call to final report.

How far in advance should I book a Solana auditor?

Contact auditors four to eight weeks before you need the report, as soon as the scope is stable. Established Solana security firms are often booked several weeks ahead.

Can a Solana audit be done in a week?

For a small, simple program with a clear spec and tests, sometimes. For complex protocols, a one-week review usually means less engineer time on your code; ask how many engineers, for how many days, and what is out of scope.

How long does the fix review take?

Usually three to ten days after your team has fixed the findings. Include it in the quote and the schedule; the first report is not the end of the audit.

How many days does a Solana audit take?

Measured in engineer-days, from about 3.5 for a 500-line simple Anchor program to about 23 for a 3,000-line lending protocol with an oracle, by our calculator method with the fix review included. Two engineers working in parallel roughly halve the calendar time, so a small audit can finish in 1-2 weeks.

Why does it take so long to start a Solana audit?

Because established Solana auditors are booked ahead. The wait for a start date is typically 2 to 8 weeks, longer before big launches, and it is often longer than the review itself. Contact auditors when the scope is stable, typically 4 to 8 weeks before you need the report.

Estimate your audit timeline

Enter lines of code, complexity and framework to get an indicative cost and calendar time, then get a hand-picked shortlist of Solana auditors. Free for teams.

Open the calculator →